You only need the Floor Level command if there is a deviation from the currently measured floor height to the final floor height of the kitchen planning.
Step 1: Choose Floor Level.
Step 2: Give either
shows a positive value if the new altitude level is above the measured level.
or
shows a negative value if the new altitude level is below the measured level.
Step 3: Click OK.