Step 1: Close SiteMaster Kitchen.
Step 2: Save the new Report_*.dwg file on the measurement PC in a safe directory.
Step 3: Open the following directory:
C:\Users\Username\AppData\Roaming\SiteMaster Kitchen\17.3.***\Support\Planlayout\english\
Step 4: Copy the Report_*.dwg file into this directory. Rename the Original Report.dwg, e.g. in Original_Report.dwg.
Step 5: Change Report_*.dwg to Report.dwg.
Open SiteMaster again. Draw a wall. When you have started the wall development, the new measurement area is available in the layout.
This is also possible for version S910 under the corresponding program directory:
C:\Users\Username\AppData\Roaming\SiteMaster KitchenS910\17.3.***\Support\Planlayout\english