Step 16: Change the Floor Level

SiteMaster Kitchen v6, Change the Floor Level

Sabine Becker avatar
Written by Sabine Becker
Updated over a week ago

You only need the Floor Level command if there is a deviation from the currently measured floor height to the final floor height of the kitchen planning.

Step 1: Choose Floor Level.

Step 2: Give either

  • shows a positive value if the new altitude level is above the measured level.

or

  • shows a negative value if the new altitude level is below the measured level.

Step 3: Click OK.

Did this answer your question?